Nikole Tesle 2?/1, 88104 Mostar, Bosnia and Herzegovina
+387 49 233 420
info@rotex-group.com

Our Projects

30+ Completed Industrial Projects Across Europe

Project Portfolio

Delivering excellence across multiple countries and industries

Alstom Gmbh/EUROMONTEC

Ledvice, Austria

Engagement workers for maintenance CSK, recuperator, hot side regeneration heaters and heat exchangers on the block. A2

2012

DOSSAN POWER SYSTEM

Obrenovac, Serbia

Revision and recovery boiler (membrane wall pressure panel), recovery horizontal wall

2012

THERMAL POWER, Gacko

Gacko, BiH

Installation of the membrane wall, boiler repairs on the evaporator

2013

TVO/DCNS COMPANY

Finland, Olkiluoto

FINLAND, OLKILUOTO

2013

ARCELOR MITTAL

Zenica, BiH

STEEL FACTORY, ZENICA - CRAIN

2014

NS TERMOMONTAŽA

Pecinci, Serbia

MAINTAINANCE OF BOILER

2014

METAL/INNSE/ESOTECH

BiH

STEEL FACTORY, METAL - DEDUSTING SYSTEM, VACUM

2014

ARCELLOR MITTAL

Zenica, BiH

MAINTAINACE OF TRANSPORTERS

2015

ROS ADRIA D.O.O, MODRICA

BiH

TANKS FOR PARAFFIN (7000m2)

2014

SIEMENS/TAYCON/IMC

TPP, Cairo, Egypt

Diverter instalation

2016

ACRONI/PRIMETALS/ESOTECH

Acroni, Slovenia

ERECTION OF BAG FILTER, AND DEDUSTING SISTEM

2016/2017

ACRONI/PRIMETALS/ESOTECH

Acroni, Slovenia

Instalation of pipe line, pupms station

2016

ACRONI/PRIMETALS/ESOTECH

Acroni, Slovenia

Erection of conveyors, and MHS

2016/2017

ARVEDI/SOMIN | ARVEDI

Italy

Instalation of hight pipe line

2016

Sunoko d.o.o Novi Sad

Mont-r | Pecinci-Serbien

Production of air heater for steam boiler "Djuro Djakovic"

2011

Sunoko d.o.o Novi Sad

Mont-r | Vrbas-Serbien

Dismating and instalation of new boiler l6t

2011

Notadolce A.D

Mont-r | Senta-Serbien

Repair of the boiler for burning waste

2011

Sunoko d.o.o Novi Sad

Mont-r | Kovacica-Serbien

Works on the disassembly and assembly of the boiler pressor

2011

Sugar industy s.a

Mont-r | Crvenka-serbien

Working of maintainance of boiler pipeline pipe

2011

Sunoko d.o.o Novi Sad

Mont-r | Pecinci-Serbien

Partial rehabilitation of the evaorator heating surfaces of boiler-block Bt. Disassembly and assembly of 250 m2 evaporator membrane panels spiral

2011

Te Nikola tesla

Mont-r | Obrenovac

Disassembly and assembly of pipe systems including superheater tubes 3 and the suspension including superheater 3 block ing pipeline and rectifier

2012

Balcke Durr gmbh/NS TERMOMONTAŽA

Germany

Installation of the pipeline interconnective economizers, maniford and chamber

2012

KW Neurat/NS TERMOMONTAŽA

Germany

Measures of reparation on the part of the pressure

2012

JP Vodovod | B.Brod

B. Brod, BiH

Water tank battles (2500m2)

2012

Akrus d.o.o, Roa Adria

B. Brod, BiH

Receiving tanks for crude oil (24 000m2)

2012

Te Nikola tesla

Mont-r | Usce

Repair of boiler tube system block B2 TENT B- Obrenovac

2012

IHI power |Termoelektro|euromont

Lünen - Nemacka

Instalation of new boiler

2012

Alstom Gmbh/EUROMONTEC

Poceřad -Češka

Engagement-workers

2012

Ready to Start Your Project?

Join our growing list of satisfied clients across Europe